Project for Comal ISD Playgrounds

FOR IMMEDIATE REALEASE
SEPTEMBER, 20, 2024

Villarreal Civil Group Selected for Demolition & Earthwork on Timberwood Park Elementary Playground for Comal ISD

New Braunfels, TX – Villarreal Civil Group is excited to announce its role in the site development for the Timberwood Park Elementary Playground Project, awarded by Dawson Construction, LLC and commissioned by Comal Independent School District. This contract includes comprehensive demolition and earthwork services as part of the district’s ongoing efforts to enhance student facilities and outdoor learning environments.

Scope of Work – Demolition Services Include:
  • Removal and haul-off of existing playground equipment, benches, and shade structures
  • Demolition of foundations to 4’ below finished grade
  • Removal of gravel, wood fiber, and mulch
  • Demolition and haul-off of concrete sidewalks, curbs, channel, flatwork, and asphalt paving
  • Removal of concrete retaining walls, basketball goals, and footings
  • Saw cutting, fence demolition, and provision of dumpsters for all demo-related debris
  • Complete demo of all WPAP basin components (sand, filter fabric, piping)


Scope of Work – Earthwork Services Include:
  • Site excavation, cut and fill, grading, and embankment to meet design elevations
  • Grubbing, rough grading, and moisture conditioning of subgrades
  • Base preparation for playground pad, turf areas, and sidewalks
  • WPAP Basin excavation and preparation
  • Asphalt patching and final grading across all sitework areas
  • Excavation for modular block retaining wall
  • Installation of pavement sections as designed by MTR Engineers, LLC
  • Layout and staking for lines, grades, and elevations prior to construction
  • Protection of trees to remain, and full compliance with SWPPP regulations throughout project duration

Project Compliance & Quality Control

As part of Villarreal Civil Group’s commitment to project integrity, the team will:
  • Maintain a full-time onsite foreman/superintendent
  • Verify all utility locations and cease work immediately if adjacent structures or underground systems are impacted
  • Complete all required field surveying and coordinate with Dawson Construction’s benchmarks and control lines
  • Meet all compaction and testing requirements, including payment for retests if density thresholds are not met

“We are proud to support Comal ISD in building safer, more modern playground,” said Joseph Villarreal for Villarreal Civil Group. “This project highlights our team’s ability to deliver precision demolition and site prep services for public institutions with professionalism and accountability.”


About Comal ISD:
Comal Independent School District serves more than 30,2350 students across multiple communities in Central Texas, including New Braunfels, Bulverde, Spring Branch, and parts of San Antonio. The district is known for its commitment to academic excellence, student safety, and providing modern, well-equipped facilities to support growth and innovation in education.

About Villarreal Civil Group

Founded on a commitment to quality, safety, and precision, Villarreal Civil Group specializes in civil construction services across Central Texas. With proven expertise in earthwork, demolition, site preparation, and stormwater compliance, we support general contractors, developers, and public agencies in delivering projects that meet the highest standards. Our team takes pride in completing every scope of work efficiently, professionally, and to spec—on time and on budget.

Two construction workers are walking in front of a bulldozer on a dirt road.
March 24, 2025
Spring Branch, TX — Villarreal Civil Group is proud to announce the launch of a new construction project in partnership with Marksmen General Contractors, LLC. The project, titled Home Church Site Improvements, is located at 7100 US-281, Spring Branch, TX 78070, and is scheduled for completion by September 8, 2025. This project marks another significant collaboration between Villarreal Civil Group and Marksmen General Contractors. Villarreal Civil Group will be responsible for executing the Site Work and SWPPP (Stormwater Pollution Prevention Plan) scopes in accordance with the approved Contract Documents. Scope of Work Includes: Demolition: Removal of trees, vegetation, fencing, asphalt parking lots, drives, and a metal storage building as specified in the contract. Earthwork & Excavation: Rock excavation, site clearing and haul off, spoil removal, site embankment, and grading to prepare for new infrastructure. SWPPP & Erosion Control: Including permitting, signage, silt fencing, monthly inspections, tree protection, construction entrance, concrete washout pit, and temporary rock berm. Paving & Pad Preparation: Subgrade preparation and base for a new asphalt parking lot. Construction of a new asphalt drive and parking areas. Building pad prep for a new restroom pavilion. Import and placement of select fill materials. Grading around sidewalks and curb lines. Installation of a permeable pavement system and 5” rip rap with geotextile behind curbs. This work will be completed with full compliance to the geotechnical report and all contract specifications, ensuring safety, sustainability, and longevity in the site’s development. “We are excited to support Marksmen General Contractors and Home Church in delivering meaningful improvements to this community space,” said Joseph Villarreal, CEO of Villarreal Civil Group. “Our team is fully committed to completing the project with excellence and professionalism.” For more information about Villarreal Civil Group or partnership opportunities, please contact Joseph Villarreal at jvillarreal@vcgsouthern.com.
The frost banking investments insurance logo is black and white.
February 12, 2025
Austin, TX – Villarreal Civil Group is proud to announce its role as the site work subcontractor for the upcoming Frost Sawyer Ranch project, a new Frost Bank location being constructed by SpawGlass Contractors, Inc. in Central Texas. As a trusted partner in commercial site development, Villarreal Civil Group will deliver a comprehensive scope of earthwork and grading services to support this high-profile financial institution build. The project includes compliance with all addenda, inspections, utility coordination, and grading to meet ADA and geotechnical standards. Scope of Work Highlights Include: Coordination with other trades, review of shop drawings, and attendance at subtrade meetings Verification of all existing utilities and maintenance of utility locates throughout the project Site excavation, cut/fill, and compaction per Geotechnical Report and final design elevations Installation of 4” Flex Base subgrade, building pad undercut and select fill, 5’ foundation overbuild Grading for building pads, sidewalks, parking, drainage, and all flatwork to meet ADA compliance SWPPP compliance and stormwater management throughout project duration Tree removal, clay cap installation, and landscape area preparation All required mobilizations, pumping, trench drying, and shift work needed to meet the schedule Final site cleanup and compliance inspections in coordination with SpawGlass and city officials Project Oversight and Commitment to Excellence Villarreal Civil Group is responsible for ensuring the utility and earthwork systems are fully operable, even in areas where items may not be explicitly noted in plans but are considered essential for system performance. The team will also manage layout and staking, maintain precise grade tolerances, and uphold OSHA standards through approved excavation protections. “We’re honored to partner with SpawGlass on a project that blends functionality, safety, and long-term value for the community,” said a spokesperson for Villarreal Civil Group. “Our team is committed to delivering with precision and professionalism, ensuring Frost Bank’s newest location opens on a strong, stable foundation.” About Frost Bank & the Sawyer Ranch Location Frost Bank is a well-respected Texas-based financial institution known for its long-standing history of service and community engagement. The Sawyer Ranch location will serve the fast-growing region of Central Texas, offering modern banking services and local economic investment.
A logo for texas water company with a mountain in the background
November 4, 2024
New Braunfels, TX – Villarreal Civil Group is proud to announce its role in the KT Water Supply project, partnering with MGC Contractors, Inc., the General Contractor, and Texas Water Company, the project owner. The project is located in New Braunfels, Texas, and will support future water infrastructure development for the region. Texas Water Company, a long-standing water utility provider serving residential and commercial customers throughout South Central Texas, continues to invest in critical infrastructure to meet the area’s rapid growth. The KT Water Supply project represents another step forward in delivering safe, reliable water resources to the communities of Comal County. As part of the contracted work, Villarreal Civil Group will perform a comprehensive scope of earthwork and site preparation, including: Field engineering and layout specific to the earthwork package Machine control modeling for precision grading Right-of-way mulching, clearing, hand-clearing, pruning, and mowing Rock excavation and site debris haul-off Cut to fill per design sheet C2 Installation of CNM200NT filter fabric Placement of Type 2 Grade A base material for tank leveling DN Tanks 6” base section over fabric Earthwork per DN Tank general conditions Additionally, Villarreal Civil Group will clear a 30” pipeline right-of-way through the Kreusler, Taylor, Nitsch, and Chesmar properties, staying within a 40-foot ROW limit and stockpiling mulch in designated areas along the outer limits. The ROW work is scheduled for completion by March 1, 2025, and the entire project has an estimated duration of six weeks. “We’re excited to contribute to another meaningful infrastructure project that directly impacts the quality of life in Central Texas,” said Joseph Villarreal from Villarreal Civil Group. “Our team is committed to delivering precise, on-schedule work that supports long-term utility development in the region.” For more information about this project or to inquire about Villarreal Civil Group’s site development services, visit www.villarrealcivilgroup.com or contact the team directly.